Screen Install Job Checklist (Field Template)
A practical install/rescreen checklist technicians can run before calling a job complete.
Direct answer
Use a short, enforceable checklist: verify scope, confirm materials, install, photo closeout, customer notes, and incomplete items.
Key takeaways
- Checklists fail when they are too long for real truck use.
- Photo closeout belongs on the checklist.
- Track incomplete items as follow-up work, not silent debt.
Checklist
1) Confirm address and access
2) Confirm sold scope vs site reality
3) Verify mesh/frame/hardware on truck
4) Complete install/repair
5) Capture after photos
6) Note leftovers / remakes
7) Customer acknowledgement notes
8) Mark complete or create follow-up
See ScreenOps workflows
Walk dispatch, consultations, field work, and production in the interactive demo.
